Follow these guidelines when draining your pool:
- Ensure chlorine and salinity levels in a pool are zero by not chlorinating it for approximately four days and testing levels prior to discharge.
- Discharge water to a sewer connection. If a sewer connection is not available, a hose connecting the pool to the curb gutter is also acceptable after neutralizing.
- Visit the Yorba Linda Water District website to find additional information for pool filling guidelines.